Skip to Content

FJD PaintMaster Parking

FJD PaintMaster Parking

FJD PaintMaster Parking is the world’s first high-pressure parking lot striping robot built around a fully digital workflow. It combines FJD Trion S2 Max Scanner, SiteMind world-model planning, vision-based alignment, and robotic high-pressure striping to support both new layout striping and existing-line repainting. From site capture to final striping, it helps crews reduce manual setup, deploy faster, and deliver more accurate, consistent parking lot markings.

Brochure ​

Less Labor. Faster Striping.

Autonomous Marking
Follows planned routes to reduce repetitive manual work on parking lot striping jobs.
Fast Site Capture
Use the FJD Trion S2 Max scanner to capture layout data faster and reduce measuring, pre-marking, and repeated checks.


 Learn More
Fleet Management
Coordinate multiple robots across large parking lots and multi-zone projects.  

New layouts and repainting

Built for new layouts and existing-line repainting.

New Layout Striping

Create parking stalls, arrows, access aisles, no-parking zones, and crosswalks from scanned site data.

Existing-Line Repainting

Use AI vision-based alignment to follow faded line edges, centerlines, arrows, numbers, and parking space boundaries with greater consistency.

Common Parking Layouts

Support standard parking lot layouts for different stall plans and site requirements.

*Templates may be required for special symbols or custom markings.

From Plan to Painted Lines


Step 1:Scan

Use the FJD Trion S2 Max scanner to capture site geometry, existing lines, obstacles, and surface conditions.


Step 2: Reconstruct

Rebuild markings, parking spaces, arrows, aisles, boundaries, and safety zones in SiteMind.


Step 3: Simulate

Check the route, spray sequence, turning space, obstacle avoidance before work starts.


Step 4: Align

Use AI vision-based alignment to follow line edges, centerlines, arrows, numbers, and parking space boundaries on site.


Step 5: Stripe

Apply high-pressure striping for new layouts or repainting tasks with consistent line quality.


Step 6: Complete

Finish the striping task with clean, consistent lines ready for project handover.

Up to 80%+
Less Labor

Up to 5x
Faster Striping

Up to 50%+
Lower Maintenance Cost

*Performance may vary by site conditions, layout complexity, crew workflow, and operating environment.  ​

Safety, Visibility, and ROI

01
Dual-Layer Safety  

360° real-time monitoring and physical collision protection help improve safety in open parking areas.

02
Remote Monitoring

Track machine status, striping progress, and alerts in real time through the app.

Application Scenarios

  Outdoor Parking Lots

  Industrial Parks

Logistics Parks & Loading Zones rdens

SPECS

Complete Unit                                                                                                                                        


Weight
210 kg (463 lb)
Dimensions
1700×1120×980mm (66.93× 44.09× 38.58 in.)
Software Updates
OTA
Connectivity
4G, wireless connection
Water Resistance Rating
IPX4
Operating Temperature
5–35 °C

Line Marking System                                                                                                                            


Line Width Adjustment Range
10—25 cm (3.94 – 9.84 in.)
Marking Speed  
1–4 km/h
Paint Tank Capacity  
19 L (5 gal)
Maximum Flow Rate  
2 L/min
Maximum Pressure
20 MPa

Battery & Charging                                                                                                                               


Battery Voltage
48 V
Battery Capacity
4 kWh
Runtime
6 h
Charging Time
4 h
Quick-Swap Battery
Supported
Optional / Standard /Unavailable